Axus Painter's Shorts
Axus Painters Shorts
Axus Painter's Shorts

Axus Painter's Shorts

€49,99 €25,00
Testing a sample? Add a tester brush for a cleaner, more accurate colour test.

Size: Choose an option

Size: Choose an option
28
30
32
34
36
38
40
42
44
Product Information

Description

Painter’s Shorts – Stay Cool, Comfortable & Equipped on the Job

As a professional painter or decorator, working in hot weather can be a challenge. You need workwear that keeps you cool, comfortable, and mobile, while still providing the durability and practicality required for long hours on-site. The Painter’s Shorts are designed to meet these demands, offering breathability, flexibility, and essential storage for busy decorators who need to stay efficient on the job.

Lightweight & Hardwearing for All-Day Comfort

Constructed from a tough yet lightweight fabric, these shorts provide the perfect balance of durability and comfort. They are hardwearing enough to withstand the demands of everyday trade work while being breathable and comfortable to wear in warm conditions.

Unlike heavy work trousers that can feel stifling in the heat, these shorts allow for better airflow, helping you stay cool even during intense decorating jobs. Whether you’re cutting in along skirting boards, rolling out a large surface, or wallpapering a feature wall, these shorts move with you, ensuring comfort and ease of movement throughout the day.

Practical Storage – Keep Your Tools Within Reach

Every decorator knows that having tools close at hand speeds up the job. The Painter’s Shorts come equipped with multiple pockets and loops, ensuring that you have everything you need right where you need it:

 Reinforced scissor pocket – Perfect for keeping your scissors secure and easily accessible.

 Large smartphone pocket – Safely store your phone while working on-site.

✔ Deep side pockets – Spacious enough for masking tape, putty knives, and other essentials.

✔ Adjustable tool loops – Ideal for dusting brushes, scrapers, or a hammer.

 Secure zipped pockets – Keep valuables like keys or cash safe while working.

No more going back and forth to grab tools—these shorts allow you to work efficiently and stay organised throughout the day.

Flexible Fit for Maximum Mobility

The elasticated waistband ensures a secure yet comfortable fit, allowing you to move freely whether you’re bending, kneeling, or climbing ladders. No restriction, no discomfort—just practical, easy-to-wear shorts designed for decorators who spend hours on their feet.

Ideal for Outdoor & Summer Jobs

Whether you’re painting exteriors, working indoors with limited ventilation, or tackling high-detail finishing work, these shorts are built to keep you cool while maintaining professional performance.

Why Choose Painter’s Shorts?

 Durable yet lightweight fabric – Ideal for warm working conditions.

✔ Plenty of storage – Keep your tools, phone, and essentials close at hand.

✔ Flexible fit – Designed for ease of movement and all-day wear.

✔ Built for decorators – Practical features tailored for the trade.

If you’re a painter or decorator working in hot conditionsPainter’s Shorts are an essential addition to your workwear—allowing you to stay cool, stay organised, and stay comfortable, no matter how long the job takes.

Hightlights:

  • Keeps you cool in summer
  • Hardwearing, lightweight, and comfortable fabric
  • Elasticated waist for added comfort and flexibility
  • Reinforced scissor pocket, large smartphone pocket, pencil pocket, and 10 other pockets for ample storage space
  • Non-shrinking fabric for long-lasting durability and comfort.
Paint Calculator

How much paint do you need?

Enter your wall size, number of coats and expected coverage to get a quick estimate.

Estimated Paint Needed
?L

Enter your measurements to calculate paint coverage.

Tip: Allow a little extra for porous surfaces, colour changes or future touch-ups.
Customer Reviews

Trusted by Thousands.

★★★★★

“If I were able to give 10 stars I’d do it. I ordered from Limerick on Sunday evening and my order arrived on Tuesday morning. The package was attentively wrapped and protected. I highly recommend them.”

Limerick Customer
★★★★★

“I got two deliveries recently. The first arrived the following day. The second arrived at lunchtime on the second working day. Paint is very carefully packaged. A thoroughly professional company.”

Verified Customer
★★★★★

“A super experience and one that I am eager to repeat. Paint was sent to our home in France. Queries were swiftly answered, customer service was pleasant, and the paint was dispatched immediately.”

France Customer
★★★★★

“Absolutely love PaintOnline.ie! I got all of my paint and samples through the website with ease. Delivery is always quick and the packages are packed meticulously. They’ve earned a loyal customer.”

Loyal Customer
★★★★★

“Great selection of paints and very reasonably priced. Delivery was very fast and the packaging was all biodegradable with no plastic. Would definitely use Paint Online again.”

Eco Conscious Customer
★★★★★

“Happy with all the orders. Large selection of colours and finishes for walls, wood and more. Orders arrive within a couple of days and everything is extremely well packed.”

Repeat Customer
★★★★★

“If I were able to give 10 stars I’d do it. I ordered from Limerick on Sunday evening and my order arrived on Tuesday morning. The package was attentively wrapped and protected. I highly recommend them.”

Limerick Customer
★★★★★

“I got two deliveries recently. The first arrived the following day. The second arrived at lunchtime on the second working day. Paint is very carefully packaged. A thoroughly professional company.”

Verified Customer
★★★★★

“A super experience and one that I am eager to repeat. Paint was sent to our home in France. Queries were swiftly answered, customer service was pleasant, and the paint was dispatched immediately.”

France Customer
★★★★★

“Absolutely love PaintOnline.ie! I got all of my paint and samples through the website with ease. Delivery is always quick and the packages are packed meticulously. They’ve earned a loyal customer.”

Loyal Customer
★★★★★

“Great selection of paints and very reasonably priced. Delivery was very fast and the packaging was all biodegradable with no plastic. Would definitely use Paint Online again.”

Eco Conscious Customer
★★★★★

“Happy with all the orders. Large selection of colours and finishes for walls, wood and more. Orders arrive within a couple of days and everything is extremely well packed.”

Repeat Customer
Free Colour Cards

Find your perfect colour at home.

Order free colour cards from leading paint brands and compare shades in your own light before choosing your paint.

Colour cards
Farrow & Ball colour card

Farrow & Ball

Explore iconic Farrow & Ball shades and timeless colour inspiration.

Colourtrend colour card

Colourtrend

Browse contemporary and classic Colourtrend palettes.

Dulux Heritage colour card

Dulux Heritage

View elegant Dulux Heritage colours inspired by classic interiors.

Fleetwood colour card

Fleetwood

Choose from Fleetwood colour charts and popular palettes.

Sample Pots

Try a Sample before you Paint!

Try your favourite shades on the wall and see how they look. Select Finish - Sample on any Paint!

Shop Samples
Colour Books

Browse the full palette.

Use colour books and fan decks to compare tones, discover palettes and find the right finish.

Shop Colour Books
Contact PaintOnline.ie

Need help choosing the right paint?

Our paint experts are here to help with colour advice, finish recommendations, coverage questions and product guidance for your next decorating project.