Paint Online - Buy Little Greene, Dulux, Fleetwood, Colourtrend and Farrow & Ball Paint Online. Paint Online - Buy Little Greene, Dulux, Fleetwood, Colourtrend and Farrow & Ball Paint Online. Paint Online - Buy Fleetwood, Dulux, Farrow and Ball, Colourtrend Paint Colours Online in Ireland
-50%

Axus Painter's Shorts

€49,99 €25,00

Op voorraadOp voorraadGeen voorraad meer
Inclusief belasting.

Painter’s Shorts – Stay Cool, Comfortable & Equipped on the Job As a professional painter or decorator, working in hot weather can be a challenge. You need workwear that keeps you cool, comfortable, and mobile,... Lees verder

Size: 28

  • 28
  • 30
  • 32
  • 34
  • 36
  • 38
  • 40
  • 42
  • 44
Geen voorraad meer
Categorieën: Benodigdheden

Painter’s Shorts – Stay Cool, Comfortable & Equipped on the Job

As a professional painter or decorator, working in hot weather can be a challenge. You need workwear that keeps you cool, comfortable, and mobile, while still providing the durability and practicality required for long hours on-site. The Painter’s Shorts are designed to meet these demands, offering breathability, flexibility, and essential storage for busy decorators who need to stay efficient on the job.

Lightweight & Hardwearing for All-Day Comfort

Constructed from a tough yet lightweight fabric, these shorts provide the perfect balance of durability and comfort. They are hardwearing enough to withstand the demands of everyday trade work while being breathable and comfortable to wear in warm conditions.

Unlike heavy work trousers that can feel stifling in the heat, these shorts allow for better airflow, helping you stay cool even during intense decorating jobs. Whether you’re cutting in along skirting boards, rolling out a large surface, or wallpapering a feature wall, these shorts move with you, ensuring comfort and ease of movement throughout the day.

Practical Storage – Keep Your Tools Within Reach

Every decorator knows that having tools close at hand speeds up the job. The Painter’s Shorts come equipped with multiple pockets and loops, ensuring that you have everything you need right where you need it:

 Reinforced scissor pocket – Perfect for keeping your scissors secure and easily accessible.

 Large smartphone pocket – Safely store your phone while working on-site.

✔ Deep side pockets – Spacious enough for masking tape, putty knives, and other essentials.

✔ Adjustable tool loops – Ideal for dusting brushes, scrapers, or a hammer.

 Secure zipped pockets – Keep valuables like keys or cash safe while working.

No more going back and forth to grab tools—these shorts allow you to work efficiently and stay organised throughout the day.

Flexible Fit for Maximum Mobility

The elasticated waistband ensures a secure yet comfortable fit, allowing you to move freely whether you’re bending, kneeling, or climbing ladders. No restriction, no discomfort—just practical, easy-to-wear shorts designed for decorators who spend hours on their feet.

Ideal for Outdoor & Summer Jobs

Whether you’re painting exteriors, working indoors with limited ventilation, or tackling high-detail finishing work, these shorts are built to keep you cool while maintaining professional performance.

Why Choose Painter’s Shorts?

 Durable yet lightweight fabric – Ideal for warm working conditions.

✔ Plenty of storage – Keep your tools, phone, and essentials close at hand.

✔ Flexible fit – Designed for ease of movement and all-day wear.

✔ Built for decorators – Practical features tailored for the trade.

If you’re a painter or decorator working in hot conditionsPainter’s Shorts are an essential addition to your workwear—allowing you to stay cool, stay organised, and stay comfortable, no matter how long the job takes.

Hightlights:

  • Keeps you cool in summer
  • Hardwearing, lightweight, and comfortable fabric
  • Elasticated waist for added comfort and flexibility
  • Reinforced scissor pocket, large smartphone pocket, pencil pocket, and 10 other pockets for ample storage space
  • Non-shrinking fabric for long-lasting durability and comfort.
Size

28, 30, 32, 34, 36, 38, 40, 42, 44

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
Zondag maandag dinsdag woensdag donderdag vrijdag zaterdag
januari, februari, maart, april, mei, juni, juli, augustus, september, oktober, november, december
Niet genoeg artikelen beschikbaar. Nog maar [max] over.
Zet op verlanglijstBlader door verlanglijstVerlanglijst verwijderen
Winkelwagen
Bestelnotitie toevoegenBestellingsnotitie bewerken

Axus Painter's Shorts

28
28
€49,99 €25,00